Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Centipod WEC, Survivable Wave Energy Converters, Final Technical Report
This project shows that the choice of a secondary DOF for survivability is a viable option to reduce the levelized cost of energy (LCOE) in WEC designs. This report will cover the calculation of the concluded LCOE advantage using Dehlsen Associates’ “Centipod” WEC, but will ...
McCall, A. Dehlsen Associates, LLC
Oct 16, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave xWave Device, Non-Commercially Sensitive Project Report
CalWave has developed a submerged pressure differential type Wave Energy Converter (WEC) architecture called xWave. The single body device oscillates submerged, is positively buoyant, and taut moored to the sea floor and integrates novel features such as absorber submergence depth...
Lehmann, M. and Davidson, R. CalWave Power Technologies Inc.
Feb 29, 2024
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Model and experimental validation of ocean kite dynamics and controls
This submission includes two peer-reviewed papers from researchers at North Carolina State University presenting the modeling and lab-scale experimentation of the dynamics and control of a tethered tidal ocean kite. Below are the abstracts of each file included in the submission.
...
Vermillion, C. et al North Carolina State University
Mar 01, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Initial Testing of Wave Energy-Powered UV-C LED Anti-Biofouling System, Post-Access Report, 3newable LLC
Biofouling severely limits the quality of data coming from buoy-mounted sensors. 3newable is co-developing a unique solution to the biofouling problem together with the Ocean Observatories Initiative (OOI) at WHOI to design and build a buoy-mounted WEC as an integrated power sourc...
Minsky, M. et al 3newable LLC
Sep 20, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Control-based optimization for tethered tidal kite
This submission includes three peer-reviewed (under review) papers from the researchers at North Carolina State University presenting control-based techniques to maximize effectiveness of a tethered tidal kite. Below are the abstracts of each file included in the submission.
Cobb...
Vermillion, C. et al North Carolina State University
Mar 02, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
UMass 2-Body WEC Techno-Economic Assessment
The University of Massachusetts (UMass) is developing a 2-body wave energy converter (WEC) device that is converting mechanical power into electricity using a mechanical motion rectifier that allows the system to couple to a flywheel. UMass has completed numerical modeling, wave t...
Previsic, M. Re Vision Consulting
Nov 19, 2024
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
M3 Wave DMP/APEX WEC Numerical Survivability Report Baseline Geometry
Summary of numerical survivability modeling method for the baseline geometry of the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Roberts, J. et al M3 Wave
Aug 16, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave Holistic PTO Design Product Requirement Document
CalWave Power Technologies is currently in the process of developing the conceptual architecture for a fully upscaled Wave Energy Converter. Current and past efforts have been for smaller scaled systems, with commensurately lower forces and length scales. This document contains a ...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan
Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Survival Test Report
This survival test report for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," summarizes the key tank test data, numerical model results, input test conditions (both numerical and tank testing), and crosses these items with three designs of t...
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 31, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TEAMER: Biofouling Analysis for Wave Energy Piston Design Load Cell Data
Biofouling and corrosion are a major concern for all ocean-deployed components, especially when mechanical motion is involved. Triton has developed the concept of a biofouling mitigation seal as part of the piston sealing assembly for the Triton Wave Energy Converter (TSI-WEC). Th...
Robertson, T. et al Triton Systems, Inc.
Nov 01, 2021
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Downselected System Overviews
In 2014, open water testing revealed that sediment scour around and under the device was significant and likely interrupted operations. To explore methods to mitigate this phenomenon, M3 developed a number of alternate concepts as detailed in concept sketches. This submission incl...
Morrow, M. and Delos-Reyes, M. M3 Wave
Sep 29, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
WEC Controls Optimization Final Report
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be cons...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing SEWEC Attenuator
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the SEWEC team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary meas...
Scharmen, W. Ricardo Detroit Technical Center
Oct 07, 2016
33 Resources
0 Stars
Publicly accessible
33 Resources
0 Stars
Publicly accessible
Azura Advanced Controls 1/15th Scale Wave Tank Testing
Experimental data from the wave tank test of the Advanced control systems developed by Northwest Energy Innovations (NWEI) for the Azura at the University of Maine in Orono (UMO). Summary data is included utilizing the WEC Lab Testing Content Model v2.1. All raw and processed expe...
Ling, B. Northwest Energy Innovations
Feb 02, 2018
10 Resources
0 Stars
Publicly accessible
10 Resources
0 Stars
Publicly accessible
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Curated
2 Resources
1 Stars
Curated
TEAMER: Sandia and CalWave Torque Spring Assessment
Power-take-off (PTO) systems for wave energy converters (WEC) require restoring forces for efficient hydrodynamic as well as mechanical to electric power transfer. Implementation of an effective spring mechanism that can provide a restoring torque on e.g. a rotational, winch type ...
Boerner, T. et al CalWave Power Technologies Inc.
Apr 01, 2022
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
Design Specifications for Manufacturer for the HydroAir Power Take Off System
Includes Design Specs for Manufacturer, PTO Weight, PTO Dimensions, Turbine (Rotor and Ductwork) Design, CAD Drawings of the turbine and rotor, List of components and weights, Materials Used, Generator, List of components and weights, Structural Design, CAD drawings of the structu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Single Turbine Test Procedure and Data Acquisition Plan
This document describes the test procedure and the data acquisition plan for the Single Turbine Subsystem (STS) testing that is part of the Advanced TidGen Power System. The goal of the Advanced TidGen Power System is to demonstrate a commercially viable tidal power system, integr...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC 1:10 Scale Preliminary Tank Test Plan
This is a preliminary test plan for testing of the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," at Hinsdale Wave Research Laboratory at Oregon State University. Additional logistical details and instrumentation specifics will be added as engi...
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 23, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torqu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Drifting Acoustic Measurements around C-Power's SeaRay WEC
The repository contains underwater noise measurements and associated metadata collected around C-Power's SeaRay wave energy converter on July 15, 2024 and July 16, 2024 while it was deployed at the U.S. Navy's Wave Energy Test Site (WETS) in Kaneohe, HI. Measurements were obtained...
Polagye, B. et al University of Washington
Jul 16, 2024
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated