Search MHK Data
Showing results 1 - 13 of 13.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
TEAMER: Initial Testing of Wave Energy-Powered UV-C LED Anti-Biofouling System, Post-Access Report, 3newable LLC
Biofouling severely limits the quality of data coming from buoy-mounted sensors. 3newable is co-developing a unique solution to the biofouling problem together with the Ocean Observatories Initiative (OOI) at WHOI to design and build a buoy-mounted WEC as an integrated power sourc...
Minsky, M. et al 3newable LLC
Sep 20, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Wave Energy Prize Wave Calibration Data for the 1:20 Scale Testing at MASK
Time series data, sensor layout, and wave calibration summaries for the wave height measurements for the 10 calibration sea states for the 1:20 scale testing of the Wave Energy Prize (WEP) at the US Navy's Maneuvering and Seakeeping (MASK) Basin at the Naval Surface Warfare Center...
Driscoll, R. National Renewable Energy Laboratory
May 08, 2017
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
SeaRAY WEC Preliminary Design and Test Planning
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Hammagren, E. et al Columbia Power Technologies, Inc.
May 18, 2020
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
Advanced Control Systems for Wave Energy Converters
This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture eff...
Scruggs, J. et al Resolute Marine Energy, Inc.
Jan 30, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan
Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Observation-Based Resource Assessment of Gulf Stream MHK
Multi-year measurements of current velocity, salinity, and temperature from fixed and vessel-mounted sensors quantify Gulf Stream (GS) MHK resource variability and inform development off Cape Hatteras, NC. Vessel transects across the GS demonstrate a jet-like velocity structure wi...
Muglia, M. et al North Carolina State University
Jan 01, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Laboratory Experiments for Highly Nonlinear WEC-Wave Conditions
This document describes the experiments carried out in December 2019 and February-March 2020 in the Directional Wave Basin at the O.H. Hinsdale Wave Research Laboratory, Oregon State University. Regular and irregular waves were generated in the absence and presence of a WEC, inclu...
Robertson, B. et al Oregon State University
Apr 30, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TEAMER: Performance mapping of Re Vision's Persistance PTO
Contains datasets from experimental measurements that were used to validate Re Vision's Persistence PTO's efficiency and performance. These measurements were obtained using a dynamometer test bench setup. The data includes open-circuit voltage and loss measurements to validate mac...
Labuschagne, H. et al National Renewable Energy Laboratory
Jul 09, 2024
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated
HERO WEC 2024 Hydraulic Configuration Deployment Data
The following submission includes raw and processed data from the in water deployment of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of parquet files, TDMS files, CSV files, bag files and MATLAB workspaces. This dataset was collected...
Jenne, S. et al NREL
Mar 14, 2024
9 Resources
0 Stars
In curation
9 Resources
0 Stars
In curation
Advanced WEC Dynamics and Controls, Test 1
Numerous studies have shown that advanced control of a wave energy converter's (WEC's) power take off (PTO) can provide significant increases (on the order of 200-300%) in WEC energy absorption. Transitioning these control approaches from simplified paper studies to application in...
Coe, R. Sandia National Laboratories
Feb 26, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Evaluation of a Wave Powered Water Pump Performance by Ocean Field Testing and WEC-Sim Modeling
This submission from AMEC (the Atlantic Marine Energy Center) includes data from an ocean field deployment of a wave powered water pump in March 2023. The wave pump is an upweller device, designed to enhance macroalgal aquaculture.
The wave pump device was deployed off the coast ...
Kimball, C. et al University of New Hampshire, Atlantic Marine Energy Center (AMEC)
Mar 21, 2023
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Design Details
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simula...
Banko, R. et al Dehlsen Associates, LLC
Jun 03, 2015
22 Resources
0 Stars
Publicly accessible
22 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible