Search MHK Data
Showing results 51 - 54 of 54.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Reference Model 3 Scaled Geometry (RM3: Wave Point Absorber)
Contains the Reference Model 3 (RM3) scaled scale geometry files of the Wave Point Absorber, developed by the Reference Model Project (RMP). These scaled geometry files are saved as SolidWorks assembly, IGS, and STEP files, and require a CAD program to view. The scaled RM3 device ...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Tidal Resource Data from Sequim Bay Inlet, WA, August 2020
Data from a Nortek Signature1000 deployed on a lander for 14 days in Aug 2020 in the entrance to Sequim Bay, WA. Raw data were processed using the DOLfYN python package and standardized using the ME Data Pipeline python package, tsdat version 0.2.12. Processed data were partitione...
McVey, J. and Cavagnaro, R. Pacific Northwest National Laboratory
Aug 13, 2020
18 Resources
1 Stars
Publicly accessible
18 Resources
1 Stars
Publicly accessible
2017 Western Passage Tidal Energy Resource Characterization Measurements
These data are from tidal resource characterization measurements collected between April and July 2017 in Western Passage near Eastport, Maine, USA.
The dataset contains the following four sub-datasets, each of which is described in more detail in the README.pdf.
1. A bottom-mou...
Kilcher, L. et al National Renewable Energy Laboratory
Jul 31, 2017
33 Resources
0 Stars
Publicly accessible
33 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible