Search MHK Data
Showing results 1 - 11 of 11.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Oscilla Power Triton 1310 System Overview and Baseline LCOE Calculations
This project aims to enhance survivability of a multi-mode point absorber. Included in this submission are content models providing a system definition and baseline LCOE calculations.
Mundon, T. Oscilla Power, Inc.
Jan 03, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Final Technical Report
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
StingRAY H1 Humboldt Cost Breakdown Structure
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Triton-C WEC Numerical and LCOE Content Models (DDP)
These are the Content Models for the Triton-C multi-mode point absorber WEC based on the Detailed System Design Package (DDP), including WEC Numerical and LCOE Content Models.
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Dec 21, 2020
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Centipod WEC, Advanced Controls, Quarterly Technical Report
Quarterly Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeli...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Content Model for the Heaving Point Absorber Buoy
This is the LCOE analysis spreadsheet and content model for the heaving point absorber buoy developed for controls purposes. The cost assessment was done on a wave-farm of 100-units.
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Jul 14, 2017
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
WEC Controls Optimization Final Report
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be cons...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Reference Model 3 Cost Breakdown (RM3: Wave Point Absorber)
Contains the Reference Model 3 (RM3) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM3 device and multiple unit arrays. These spreadsheets are contained within an XLSX file and a spreadsheet editor such as Mi...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible