LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
LCOE Baseline for RME Surge WEC Device
This submission includes all the data to support an LCOE baseline assessment for the Resolute Marine Energy (RME) Surge WEC device.
Previsic, M. et al Re Vision Consulting
Jul 19, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Techno-Economic Optimization of the SurgeWEC Device
This is the post-access report for a Teamer-funded effort to optimize the SurgeWEC device, a near-shore pivoting flap wave energy conversion device used to desalinate water. Parametrically driven cost and performance models enabled an integrated optimization approach at the farm s...
Previsic, M. Re Vision Consulting
Feb 20, 2022
2 Resources
0 Stars
In curation
2 Resources
0 Stars
In curation
LCOE Baseline for Wave Carpet WEC Device
This is an LCOE (levelized cost of energy) baseline assessment for the Wave Carpet.
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Projected LCOE
Projected LCOE model for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," based on information gained during project performance.
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 01, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Preliminary IO&M and Testing Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX Model Baseline LCOE
This is the raw LCOE model used to establish baseline performance for the M3 Wave DMP/APEX submerged mid-column pressure differential WEC. The model includes initial capital cost, levelized replacement cost, levelized operations and maintenance cost, and net annual energy producti...
Morrow, M. M3 Wave
Feb 28, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
MHK Levelized Cost of Energy (LCOE) Guidance and Techo Economic Analysis Materials
Useful information and tools for calculating the Levelized Cost of Energy (LCOE) and MHK Cost Breakdown Structure. Includes a structure for calculating the capital expenditures and operating costs of a marine energy technology or device, reference resource data for both wave and ...
Jenne, S. and Baca, E. National Renewable Energy Laboratory
Nov 08, 2019
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
WEC Controls Optimization Final Report
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be cons...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced Control Systems for Wave Energy Converters
This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture eff...
Scruggs, J. et al Resolute Marine Energy, Inc.
Jan 30, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible