Search MHK Data
Showing results 101 - 125 of 243.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
TidGen: Single Turbine System Performance Analysis
This document offers a detailed performance analysis of the Single Turbine System (STS) developed by ORPC in Cobscook Bay, Maine, in 2023. The report includes system descriptions, deployment, and planned instrumentation, alongside data collection strategies. The performance evalua...
McEntee, J. Ocean Renewable Power Company
Jan 11, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Tidal Energy Site Characterization East Forelands Alaska
During the summer field season in 2012, Benthic GeoScience Inc. (Benthic) mobilized under contract with Ocean Renewable Power Company (ORPC) in order to conduct precise geospatial measurements of the seafloor accomplishing a preliminary Site Characterization Study for the ORPC Eas...
Worthington, M. National Renewable Energy Laboratory
Apr 01, 2013
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
RANS Simulation ADM of the NREL Phase VI wind turbine modeled as MHK Turbine
Attached are the .cas and .dat files for the Reynolds Averaged Navier-Stokes (RANS) simulation of a single lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CFD-package.
In this case study the flow field around and in the wake of the NREL Phase VI wind turbine, modeled is MH...
Javaherchi, T. University of Washington
Jun 08, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine Subsystem (STS) Device Installation, Deployment, Retrieval, and Removal Procedures
This document provides the process details for installation of the Single Turbine Subsystem (STS) device from the assembly laydown location to the deployed location in Eastport, ME. These procedures will be conducted not only during initial deployment, but also during maintenance ...
Martin, T. Ocean Renewable Power Company
Feb 20, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC Downselected System Overviews
In 2014, open water testing revealed that sediment scour around and under the device was significant and likely interrupted operations. To explore methods to mitigate this phenomenon, M3 developed a number of alternate concepts as detailed in concept sketches. This submission incl...
Morrow, M. and Delos-Reyes, M. M3 Wave
Sep 29, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
ALFA Coupled Computational Fluid Dynamics/Discrete Element Method Modeling System
The HDIS/COUPi discrete element method modeling system was used to simulate the interaction between various debris and the Research Debris Diversion Platform (RDDP)
DUVOY, P. University of Alaska Fairbanks
Nov 29, 2016
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Single Turbine Test Procedure and Data Acquisition Plan
This document describes the test procedure and the data acquisition plan for the Single Turbine Subsystem (STS) testing that is part of the Advanced TidGen Power System. The goal of the Advanced TidGen Power System is to demonstrate a commercially viable tidal power system, integr...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. In...
Hayes, N. Ocean Renewable Power Company
Jun 03, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Preliminary Turbine Hydrodynamic Design
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Final Technical Report
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave Open Water Demo Budget Period 1 Reports
The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstr...
Boerner, T. et al CalWave Power Technologies Inc.
Jun 03, 2019
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Rosario Strait Tidal Resource Characterization
Observational dataset from the Orcas Island Power and Light Coop. (OPALCO) tidal site in Rosario Strait, WA (USA). This project presents a resource characterization of the tidal currents at a proposed site for power generation in Rosario Strait, WA (USA). Acoustic Doppler Current...
Thomson, J. et al Pacific Marine Energy Center (PMEC)
Mar 20, 2025
9 Resources
0 Stars
Curated
9 Resources
0 Stars
Curated
Advanced TidGen Power System Development Test Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave Tank Testing Lir Deep Ocean Basin
Experimental tank testing report for CalWave's 1:20 & 1:30 scale prototype testing at the Lir National Ocean Test Facility in Ireland. Testing was completed in January 2018. Test report includes description of the scaled prototype, primary testing objectives, instrumentation and b...
Boerner, T. CalWave Power Technologies Inc.
Jan 15, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Next Generation RivGen Power System: Feasibility Assessment of Hydroacoutics Data for Development of a Probability of Encounter Model of Salmon Smolts
This document contains a feasibility assessment for salmon smolt characterization and analysis based on existing hydroacoustics data and probability of encounter model.
Daroux, A. and Zydlewski, G. Igiugig Village Council
Oct 04, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Co-Design of Marine Energy Converters for Autonomous Underwater Vehicle Docking and Recharging Test Data and Processing
This dataset contains experimental results from testing the Halona wave energy converter (WEC) in both fixed and floating configurations. This dataset reflects a 1/10th scale omnidirectional spar buoy oscillating water column (OWC) device, designed to improve platform stability fo...
Ulm, N. et al University of Hawaii at Manoa
Mar 01, 2021
44 Resources
0 Stars
Curated
44 Resources
0 Stars
Curated
Advanced TidGen Power System 2.0 Final BP1 Turbine Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Final System Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Triton: Survivability Enhancement of a Multi-Mode Point Absorber
The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Control and SCADA System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
MASK2B Initial Results from Wave Tank Test of Closed-Loop WEC Control
This dataset covers the MASK2B wave tank experiment focused on a more complete study of one degree of freedom (1DOF) control of the WEC was considered, including maximization of electrical power, multi-objective performance mapping, and implementation of a novel predictionless con...
Coe, R. et al Sandia National Laboratories
May 25, 2018
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible