Search MHK Data
Showing results 201 - 225 of 248.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Admiralty Inlet Advanced Turbulence Measurements: June 2014
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in June of 2014. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on Tidal Turbulence Mooring's (TTMs). The TTM positions the ADV head above the seafloor to make mid...
Kilcher, L. National Renewable Energy Laboratory
Jun 30, 2014
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
Wave Carpet Controls Design Optimization
To assess CalWave's submerged Wave Carpet Technology for system performance advancement,
CalWave seeks to test advanced controls methodologies on a simplified wave carpet model, which
potentially can be used in further research to leverage the design to a full wave carpet assessme...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Awaiting release
2 Resources
1 Stars
Awaiting release
TEAMER: Experimental performance characterization of a shrouded axial-flow turbine
Sitkana has developed a shrouded hydrokinetic turbine with a modular, low-cost design that can be scaled to meet the needs of remote communities. With technical support from the University of Washington, Sitkana sought to experimentally characterize the mechanical power and struct...
McMullan, L. et al University of Washington
Oct 20, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Water Tunnel Data from Testing the Pterofin Skimmer Concept
Pterofin's Skimmer concept relies on a flapping and pitching hydrofoil to extract hydrokinetic energy from water flows. The concept aims to utilize unsteady fluid dynamics phenomena (added mass, shed vorticity, and unsteady boundary layer development) to achieve higher lift coeffi...
Jaffa, N. et al Pennsylvania State University, Applied Research Laboratory
Jul 13, 2023
7 Resources
1 Stars
Publicly accessible
7 Resources
1 Stars
Publicly accessible
Drifting Acoustic Measurements around C-Power's SeaRay WEC
The repository contains underwater noise measurements and associated metadata collected around C-Power's SeaRay wave energy converter on July 15, 2024 and July 16, 2024 while it was deployed at the U.S. Navy's Wave Energy Test Site (WETS) in Kaneohe, HI. Measurements were obtained...
Polagye, B. et al University of Washington
Jul 16, 2024
2 Resources
1 Stars
Publicly accessible
2 Resources
1 Stars
Publicly accessible
Hydrokinetic Canal Measurements: Inflow Velocity, Wake Flow Velocity, and Turbulence
The dataset consist of acoustic Doppler current profiler (ADCP) velocity measurements in the wake of a 3-meter diameter vertical-axis hydrokinetic turbine deployed in Roza Canal, Yakima, WA, USA. A normalized hub-centerline wake velocity profile and two cross-section velocity con...
Gunawan, B. Sandia National Laboratories
Jun 11, 2014
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
MOIS LabVIEW Software
Software developed in LabVIEW for the Modular Ocean Instrumentation System (MOIS) is provided. Two documents: MOIS User's Guide and MOIS Software Developer's Guide are included in the submission.
Nelson, E. National Renewable Energy Laboratory
Dec 03, 2015
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
ALFA Station Keeping Results for Seabotix vLBV300 Underwater Vehicle near Newport, OR
This data set presents results testing the station keeping abilities of a tethered Seabotix vLBV300 underwater vehicle equipped with an inertial navigation system. These results are from an offshore deployment on April 20, 2016 off the coast of Newport, OR (44.678 degrees N, 124.1...
Hollinger, G. Oregon State University
Apr 20, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Modeling and Performance Data for Heaving Buoy Wave Energy Converter with a Compressible Degree of Freedom (CDOF)
Modeling and performance data in Matlab data file (.mat) containing 3 structures (WEC model, simRes_sr and simRes_fix), and a pdf document describing the model, the simulations, and the analysis that has been carried out.
Bacelli, G. Sandia National Laboratories
Sep 28, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave WEC Open Water Demonstration Public Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Advanced Wave-to-Wire OWC model in WEC-Sim
Accurate numerical models are crucial for the development of wave energy converter (WEC) technologies, providing the means for power production and lifetime assessment, site selection, and design of mooring lines, PTO systems and controllers, among other aspects. This project aims...
PeƱalba, M. et al Mondragon Goi Eskola Politeknikoa
Dec 20, 2024
5 Resources
0 Stars
Curated
5 Resources
0 Stars
Curated
M3 Wave DMP/APEX WEC Final Technical Report
This project successfully developed methods for numerical modeling of sediment transport phenomena around rigid objects resting on or near the ocean floor. These techniques were validated with physical testing using actual sediment in a large wave tank. These methods can be applie...
Morrow, M. et al M3 Wave
May 31, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
MASK3 for Advanced WEC Dynamics and Controls
This report outlines the "MASK3" wave tank test within the Advanced WEC Dynamics and Controls (AWDC) project. This test represents the final test in the AWDC project. The focus of the MASK3 test was to consider coordinated 3-degree-of-freedom (3DOF) control of a WEC in a realistic...
Coe, R. et al Sandia National Laboratories
May 01, 2019
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Wave Energy Prize Wave Calibration Data for the 1:20 Scale Testing at MASK
Time series data, sensor layout, and wave calibration summaries for the wave height measurements for the 10 calibration sea states for the 1:20 scale testing of the Wave Energy Prize (WEP) at the US Navy's Maneuvering and Seakeeping (MASK) Basin at the Naval Surface Warfare Center...
Driscoll, R. National Renewable Energy Laboratory
May 08, 2017
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
TigerRAY Drifting Tests and Wave Data Lake Washington and Puget Sound, February 2023
This dataset contains measurements from drifting deployments of the TigerRAY, a two-body wave energy converter, and four SWIFT buoys on Lake Washington and Puget Sound during February 2023. Tests were conducted under varying wave conditions, including natural waves, calm condition...
Rusch, C. et al University of Washington Applied Physics Lab
Apr 30, 2025
5 Resources
0 Stars
Curated
5 Resources
0 Stars
Curated
StingRAY Structural Optimization Final Technical Report
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing structural material and manufacturing costs and increasing energy output. ...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced WEC Dynamics and Controls, Test 1
Numerous studies have shown that advanced control of a wave energy converter's (WEC's) power take off (PTO) can provide significant increases (on the order of 200-300%) in WEC energy absorption. Transitioning these control approaches from simplified paper studies to application in...
Coe, R. Sandia National Laboratories
Feb 26, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficient...
Rhinefrank, K. Columbia Power Technologies, Inc.
Jul 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
TEAMER: OSU X Hinsdale & Sandia LUPA Uncertainty Testing
This processed data is from TEAMER testing through RFTS 7 at the O.H. Hinsdale Wave Research Laboratory in Corvallis, Oregon. This testing was conducted by Oregon State University (OSU) and Sandia National Laboratories in October and November 2023. The Laboratory Upgrade Point Abs...
Robertson, B. et al Oregon State University
Oct 19, 2023
6 Resources
0 Stars
Curated
6 Resources
0 Stars
Curated
TEAMER: OSU X Hinsdale & Sandia LUPA System Identification
This submission is part of a TEAMER testing campaign through RFTS 7 at the O.H. Hinsdale Wave Research Laboratory in Corvallis, Oregon. This testing was conducted by Oregon State University (OSU) and Sandia National Laboratories in October and November 2023.
The Laboratory Upgrade...
Robertson, B. et al Oregon State University
Oct 19, 2023
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated
Current Energy Harnessing using Synergistic Kinematics of Schools of Fish-Shaped Bodies: Marine Hydrodynamics Laboratory Tank Testing Data
The objectives of the proposed work pertain to building a high power-density and high efficiency device to harness MHK energy by mimicking fish-school kinematics. Vortex Hydro Energy is collaborating with a concept formed and undergone preliminary testing at the University of Mich...
Bernitsas, M. Vortex Hydro Energy
Apr 11, 2017
20 Resources
0 Stars
Publicly accessible
20 Resources
0 Stars
Publicly accessible