NWEI Azura July 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura Aug 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura Sept 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura Oct 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura December 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Feb 21, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura January 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing s...
Lettenmaier, T. Northwest Energy Innovations
Jan 01, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura February 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing s...
Lettenmaier, T. Northwest Energy Innovations
Mar 07, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura March 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Mar 31, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura April 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Jun 08, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura May 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Jun 07, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura June 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Aug 31, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura July 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Aug 31, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura August 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Oct 14, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura September 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Oct 15, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura October 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Nov 11, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura November 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Dec 07, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura March 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 18, 2018
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Aquantis 2.5 MW Ocean Current Generation Device MHK Hydrofoils Design, Wind Tunnel Optimization and CFD Analysis Report
Dataset contains MHK Hydrofoils Design and Optimization and CFD Analysis Report for the Aquantis 2.5 MW Ocean Current Generation Device, as well as MHK Hydrofoils Wind Tunnel Test Plan and Checkout Test Report.
Shiu, H. et al Dehlsen Associates, LLC
Jun 03, 2015
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
Triton: Survivability Enhancement of a Multi-Mode Point Absorber
The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Wave Carpet Controls Design Optimization
To assess CalWave's submerged Wave Carpet Technology for system performance advancement,
CalWave seeks to test advanced controls methodologies on a simplified wave carpet model, which
potentially can be used in further research to leverage the design to a full wave carpet assessme...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Curated
2 Resources
1 Stars
Curated
Focusing Wave Energy for Wave Energy Converter Applications
Wave tank tests at Stevens Institute of Technology quantified the ability of near-surface platforms to concentrate wave energy over the platform.
Due to the instantaneous change in water depth, mass, energy, and power are conserved in this process. The energy and power concentrat...
Raftery, M. Martin and Ottaway
Aug 10, 2010
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
State Estimation for advanced control of wave energy converters
A report on state estimation for advanced control of wave energy converters (WECs), with supporting data models and slides from the overview presentation. The methods discussed are intended for use to enable real-time closed loop control of WECs.
Coe, R. and Bacelli, G. Sandia National Laboratories
Apr 25, 2017
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
TidGen MHK Generator Composite Fatigue Analysis Procedure
A procedure was described for performing a fatigue analysis of composite foils for an MHK generator. The steps included generating load data, S-N (Stress versus Number of cycles to failure) diagrams through fatigue testing, cycle counts, damage versus load, and cumulative damage. ...
Krumpe, A. ORPC Inc.
Apr 14, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources