Search MHK Data
Showing results 26 - 50 of 56.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
NREL MOIS Data for NWEI Azura January 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 27, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura February 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 31, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura March 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 31, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura April 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 31, 2016
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura August 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Oct 03, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura September 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Oct 07, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
PacWave South SeaRAY k2 Risk Registers
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 29, 2023
12 Resources
0 Stars
Awaiting release
12 Resources
0 Stars
Awaiting release
NREL MOIS Data for NWEI Azura July 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Sep 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 SolidWorks Model
The attached zip file includes a SolidWorks pack-and-go assembly of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter) V1.0. This model does not include all aspects of the design (i.e. RO (reverse osmosis) system, electrical enclosure, hose, cable) it o...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Triton-C WEC Numerical and LCOE Content Models (DDP)
These are the Content Models for the Triton-C multi-mode point absorber WEC based on the Detailed System Design Package (DDP), including WEC Numerical and LCOE Content Models.
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Dec 21, 2020
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
NREL MOIS Data for NWEI Azura June 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Jun 30, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
NREL MOIS Data for NWEI Azura August 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 23, 2016
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
StingRAY WEC Risk Register
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. Columbia Power Technologies, Inc.
Feb 24, 2017
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
HERO WEC V1 Upgrades SolidWorks Models (WEC, RO System, and Submersible Pump Housing)
The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric ...
Jenne, S. and Panzarella, J. National Renewable Energy Laboratory
Jan 08, 2024
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
MBARI WEC 2021 deployment
This dataset includes data from the Monterey Bay Aquarium Research Institute (MBARI) wave energy converter (WEC) and a nearby located Sofar Spotter buoy. The Monterey Bay Aquarium Research Institute has developed and deployed a small two-body point absorber wave energy device suit...
Coe, R. et al Sandia National Laboratories
Oct 12, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficient...
Rhinefrank, K. Columbia Power Technologies, Inc.
Jul 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
HERO WEC Bills of Materials: WEC, RO System, and Submersible Pump
This submission includes detailed Bills of Materials for the NREL-designed and built Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), as well as the reverse osmosis assembly and submersible pump that are used in the HERO WEC.
The WEC file is specific to th...
Jenne, S. and Panzarella, J. National Renewable Energy Laboratory
Jan 01, 2024
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
StingRAY H1 Humboldt Cost Breakdown Structure
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
StingRAY Updated WEC Risk Registers
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. and Ondusko, M. Columbia Power Technologies, Inc.
Jun 27, 2018
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
Wave Tank Testing of 1-DoF Heaving Buoy for Controls Validation Purposes
This submission includes the wave tank testing data used to validate the controls optimization efforts of a heaving 1-DoF buoy.
Previsic, M. et al Re Vision Consulting
Jul 13, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
RM3 Wave Tank Validation Model
An approximately 1/75th scale point absorber wave energy absorber was built to validate the testing systems of a 16k gallon single paddle wave tank. The model was build based on the RM3 design and incorporated a linear position sensor, a force transducer, and wetness detection sen...
Candon, C. and Fao, R. National Renewable Energy Laboratory
Jul 31, 2023
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
MBARI-WEC September and October 2022 Field Data
This data is needed to simulate a model of the MBARI-WEC (Monterey Bay Aquarium Research Institute, Wave Energy Converter device) in a simulation environment (e.g. Gazebo) for 56 observation dates in the time between September and October 2022, and to compare the simulation output...
Dizon, C. et al Oregon State University
Sep 07, 2022
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
LCOE Content Model for the Heaving Point Absorber Buoy
This is the LCOE analysis spreadsheet and content model for the heaving point absorber buoy developed for controls purposes. The cost assessment was done on a wave-farm of 100-units.
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Jul 14, 2017
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible