Search MHK Data
Showing results 1 - 25 of 56.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
CalWave WEC Holistic PTO Design
This project aims to advance the Technology Readiness Level (TRL) of CalWave’s commercial scale Power Take-Off (PTO) subsystem through further increasing the level of coupling in physical PTO and concurrent controls design. This is achieved by incorporating a systematic holistic...
Boerner, T. et al CalWave Power Technologies Inc.
Sep 02, 2022
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
CalWave First Iterative PTO Description
This documents summarizes a preliminary first iterative design of a PTO device developed by CalWave. The document includes controls, hydraulic, and electric architectures from the first iteration of the CalWave PTO design that match requirements set out by the "CalWave Holistic PT...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Timeseries Data from the Experimental Testing of the OPI's Prototype Hydraulic Drivetrain.
Timeseries data from the experimental testing of the OPI's prototype hydraulic drivetrain. The data is provided in .mat file format. The units for the data can be found in the ReadMe included in the submission resources.
Mundon, T. Oscilla Power, Inc.
Nov 26, 2021
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
HERO WEC V1 Upgrade 2023 Laboratory Testing (processed data)
The following submission includes processed laboratory data from NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of MATLAB workspaces. This dataset was created using NREL's Large Amplitude Motion Platform (LAMP) and collected between Aug...
Panzarella, J. et al National Renewable Energy Laboratory
Jan 01, 2024
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
HERO WEC 2024 Hydraulic Configuration Deployment Data
The following submission includes raw and processed data from the in water deployment of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of parquet files, TDMS files, CSV files, bag files and MATLAB workspaces. This dataset was collected...
Jenne, S. et al National Renewable Energy Laboratory
Mar 14, 2024
9 Resources
0 Stars
Curated
9 Resources
0 Stars
Curated
Hydrokinetic Canal Measurements: Inflow Velocity, Wake Flow Velocity, and Turbulence
The dataset consist of acoustic Doppler current profiler (ADCP) velocity measurements in the wake of a 3-meter diameter vertical-axis hydrokinetic turbine deployed in Roza Canal, Yakima, WA, USA. A normalized hub-centerline wake velocity profile and two cross-section velocity con...
Gunawan, B. Sandia National Laboratories
Jun 11, 2014
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Holistic PTO Design Product Requirement Document
CalWave Power Technologies is currently in the process of developing the conceptual architecture for a fully upscaled Wave Energy Converter. Current and past efforts have been for smaller scaled systems, with commensurately lower forces and length scales. This document contains a ...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Open Water Demonstration PTO Belt Assessment & Test Report Public
PTO (Power Take-Off) belt test and analysis report conducted under CalWave's Open Water Demonstration Award EE0008097 Belt Tradeoffs for Winch PTO. The report tests two types of belts: a high modulus polyethylene (HMPE) woven fiber belt and a steel cable polyurethane belt. The goa...
Kojimoto, N. and Boerner, T. CalWave Power Technologies Inc.
May 28, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data sheets are included for the Main and auxiliary control cabinets and three-phase-synchronous-motor with a ...
Pearson, G. et al Dresser-Rand Company
Jun 26, 2015
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Design Details
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simula...
Banko, R. et al Dehlsen Associates, LLC
Jun 03, 2015
22 Resources
0 Stars
Publicly accessible
22 Resources
0 Stars
Publicly accessible
Azura WEC 1/15th Wave Tank Test Data
Test data from the 1/15th Wave Tank Tests of the Azura performed in 2017/2018 to validate the power performance and survivability of the Azura Design developed by Northwest Energy Innovations (NWEI) planned for deployment at the US Navy's Wave Energy Test Site. Raw and processed d...
Ling, B. Northwest Energy Innovations
Feb 02, 2018
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Laboratory Experiments for Highly Nonlinear WEC-Wave Conditions
This document describes the experiments carried out in December 2019 and February-March 2020 in the Directional Wave Basin at the O.H. Hinsdale Wave Research Laboratory, Oregon State University. Regular and irregular waves were generated in the absence and presence of a WEC, inclu...
Robertson, B. et al Oregon State University
Apr 30, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TEAMER: Sandia and CalWave Torque Spring Assessment
Power-take-off (PTO) systems for wave energy converters (WEC) require restoring forces for efficient hydrodynamic as well as mechanical to electric power transfer. Implementation of an effective spring mechanism that can provide a restoring torque on e.g. a rotational, winch type ...
Boerner, T. et al CalWave Power Technologies Inc.
Apr 01, 2022
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
Design Specifications for Manufacturer for the HydroAir Power Take Off System
Includes Design Specs for Manufacturer, PTO Weight, PTO Dimensions, Turbine (Rotor and Ductwork) Design, CAD Drawings of the turbine and rotor, List of components and weights, Materials Used, Generator, List of components and weights, Structural Design, CAD drawings of the structu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torqu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Direct-Drive Electrical Generator and PTO System for Flap-type Wave Energy Converters
Project and generator specifications and initial prototype test data for flap-type wave energy converters (WEC)
Englebretson, S. ABB Inc.
Mar 20, 2015
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Additional Degree of Freedom for WEC Model
'Additional Degree of Freedom for WEC' WEC-Sim numerical model from RFTS 1 (request for technical support) TEAMER project. An increase in wave energy converter (WEC) efficiency requires not only consideration of the nonlinear effects in the WEC dynamics and the power take-off (PTO...
McCall, A. et al Dehlsen Associates, LLC
May 26, 2022
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
CalWave Open Water Demo Budget Period 1 Reports
The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstr...
Boerner, T. et al CalWave Power Technologies Inc.
Jun 03, 2019
8 Resources
0 Stars
Awaiting release
8 Resources
0 Stars
Awaiting release
CalWave Tank Testing Lir Deep Ocean Basin
Experimental tank testing report for CalWave's 1:20 & 1:30 scale prototype testing at the Lir National Ocean Test Facility in Ireland. Testing was completed in January 2018. Test report includes description of the scaled prototype, primary testing objectives, instrumentation and b...
Boerner, T. CalWave Power Technologies Inc.
Jan 15, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Azura Advanced Controls 1/15th Scale Wave Tank Testing
Experimental data from the wave tank test of the Advanced control systems developed by Northwest Energy Innovations (NWEI) for the Azura at the University of Maine in Orono (UMO). Summary data is included utilizing the WEC Lab Testing Content Model v2.1. All raw and processed expe...
Ling, B. Northwest Energy Innovations
Feb 02, 2018
10 Resources
0 Stars
Publicly accessible
10 Resources
0 Stars
Publicly accessible
CalWave Device Behavior in Different Sea States from Scaled Tank Testing
This submission contains a summary of tank test derived WEC device behavior in different irregular sea states.
CalWave sought to conduct experimental tank testing of scaled prototype units early on in the design process to obtain a first estimation of device performance for sea ...
Boerner, T. and Murray, B. CalWave Power Technologies Inc.
Mar 30, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible