Advanced TidGen Power System Material Characterization Program
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave Open Water Demonstration PTO Belt Assessment & Test Report Public
PTO (Power Take-Off) belt test and analysis report conducted under CalWave's Open Water Demonstration Award EE0008097 Belt Tradeoffs for Winch PTO. The report tests two types of belts: a high modulus polyethylene (HMPE) woven fiber belt and a steel cable polyurethane belt. The goa...
Kojimoto, N. and Boerner, T. CalWave Power Technologies Inc.
May 28, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Composites Structural Testing
Seawater aging response was investigated in marine-grade glass/epoxy, glass/vinyl ester, carbon/epoxy and carbon/vinyl ester composites with respect to water uptake, interlaminar shear strength, flexural strength, tensile strength, and tensile fracture surface observations. The re...
Krumpe, A. ORPC Inc.
Jan 06, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Set Selection
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TEAMER: Electrically Engaged Undulation System for Unmanned Underwater Vehicles
This TEAMER RFTS 1 (Request for Technical Support) project supported the flume tank testing of a long range, high endurance unmanned underwater vehicle (UUV) to monitor maritime space. Today, battery-powered remotely operated vehicles (ROVs) lack the duration to make persistent, w...
Lu, K. and Datla, R. Pyro-E
Oct 01, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
TidGen MHK Generator Composite Fatigue Analysis Procedure
A procedure was described for performing a fatigue analysis of composite foils for an MHK generator. The steps included generating load data, S-N (Stress versus Number of cycles to failure) diagrams through fatigue testing, cycle counts, damage versus load, and cumulative damage. ...
Krumpe, A. ORPC Inc.
Apr 14, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Results of Investigating Structural Design Concepts and Alternative Materials for a Wave Power System
Included here are materials from a study on the design of a three-body Wave Energy Converter (WEC) utilizing a heave plate, dual Power Take Offs (PTOs), and single point mooring. A material trade study has been conducted to evaluate the effects of introducing various metallic and ...
Whitney, C. et al Cardinal Engineering
Apr 27, 2024
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated
TEAMER: Sandia and CalWave Torque Spring Assessment
Power-take-off (PTO) systems for wave energy converters (WEC) require restoring forces for efficient hydrodynamic as well as mechanical to electric power transfer. Implementation of an effective spring mechanism that can provide a restoring torque on e.g. a rotational, winch type ...
Boerner, T. et al CalWave Power Technologies Inc.
Apr 01, 2022
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
StingRAY Structural Optimization Final Technical Report Appendices
The protected data appendices to the public Final Technical Report.
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing stru...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
16 Resources
0 Stars
Awaiting release
16 Resources
0 Stars
Awaiting release
StingRAY Structural Optimization Final Technical Report
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing structural material and manufacturing costs and increasing energy output. ...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Biofouling Analysis for Wave Energy Piston Design Load Cell Data
Biofouling and corrosion are a major concern for all ocean-deployed components, especially when mechanical motion is involved. Triton has developed the concept of a biofouling mitigation seal as part of the piston sealing assembly for the Triton Wave Energy Converter (TSI-WEC). Th...
Robertson, T. et al Triton Systems, Inc.
Nov 01, 2021
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Design Details
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simula...
Banko, R. et al Dehlsen Associates, LLC
Jun 03, 2015
22 Resources
0 Stars
Publicly accessible
22 Resources
0 Stars
Publicly accessible
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data sheets are included for the Main and auxiliary control cabinets and three-phase-synchronous-motor with a ...
Pearson, G. et al Dresser-Rand Company
Jun 26, 2015
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
Net Shape Fabricated Low Cost MHK Pass-Through the Hub Turbine Blades with Integrated Health Management Technology
The primary objective of this project is to develop a three-blade MHK rotor with low manufacturing and maintenance costs. The proposed program will design, fabricate and test a novel half-scale low cost, net shape fabricated single piece three-blade MHK rotor with integrated healt...
Wess, D. ARL Penn State
Feb 09, 2016
24 Resources
0 Stars
Publicly accessible
24 Resources
0 Stars
Publicly accessible
Model and experimental validation of ocean kite dynamics and controls
This submission includes two peer-reviewed papers from researchers at North Carolina State University presenting the modeling and lab-scale experimentation of the dynamics and control of a tethered tidal ocean kite. Below are the abstracts of each file included in the submission.
...
Vermillion, C. et al North Carolina State University
Mar 01, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Experimental Testing of a Floating Oscillating Surge Wave Energy Converter at Hinsdale Wave Research Laboratory
In order to generate a public data set that can be used to validate Wave Energy Converter (WEC) numerical codes, such as WEC-Sim, Sandia National Laboratories led an experimental testing campaign of a 1:33 scale Floating Oscillating Surge Wave Energy Converter (FOSWEC) in the Dire...
Ruehl, K. et al Sandia National Laboratories
Jun 15, 2016
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
CalWave Tank Testing Lir Deep Ocean Basin
Experimental tank testing report for CalWave's 1:20 & 1:30 scale prototype testing at the Lir National Ocean Test Facility in Ireland. Testing was completed in January 2018. Test report includes description of the scaled prototype, primary testing objectives, instrumentation and b...
Boerner, T. CalWave Power Technologies Inc.
Jan 15, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors
The lifetime assessment experimental platform described in this report is specifically designed for testing the low-speed main shaft seal for Verdant Power's (Verdant Power Inc., New York, New York) fifth-generation (Gen5) underwater power generation turbine. This project is joint...
Murray, R. et al National Renewable Energy Laboratory
Jul 01, 2024
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
MARMOK-Oscillating Water Column: WEC Tank Testing Campaign Data (November 2022)
The main objective of this project is advancing towards the commercial viability of IDOM's floating Oscillating Water Column (OWC) technology by performing a detailed WEC design to fit PacWave-South site conditions. This includes tank testing campaign data conducted by IDOM at TEX...
De Miguel, B. and Maeso, A. IDOM Incorporated
Nov 17, 2022
3 Resources
0 Stars
Awaiting release
3 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Preliminary IO&M and Testing Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Wave Tank Testing of 1-DoF Heaving Buoy for Controls Validation Purposes
This submission includes the wave tank testing data used to validate the controls optimization efforts of a heaving 1-DoF buoy.
Previsic, M. et al Re Vision Consulting
Jul 13, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan
Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Timeseries Data from the Experimental Testing of the OPI's Prototype Hydraulic Drivetrain.
Timeseries data from the experimental testing of the OPI's prototype hydraulic drivetrain. The data is provided in .mat file format. The units for the data can be found in the ReadMe included in the submission resources.
Mundon, T. Oscilla Power, Inc.
Nov 26, 2021
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
TEAMER: CalWave xWave New Technology Qualification and Path to Certification Final Report
CalWave is developing a wave energy converter (WEC) called xWave, which operates fully submerged and is classified as a submerged pressure differential type. As ocean waves pass over the submerged wave buoy, a pressure differential is created, exciting the absorber in multiple deg...
Petcovic, D. and Zhang, S. CalWave Power Technologies Inc.
Oct 31, 2022
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated