Search MHK Data
Showing results 1 - 25 of 124.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Advanced TidGen Power System Development Test Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Single Turbine Test Procedure and Data Acquisition Plan
This document describes the test procedure and the data acquisition plan for the Single Turbine Subsystem (STS) testing that is part of the Advanced TidGen Power System. The goal of the Advanced TidGen Power System is to demonstrate a commercially viable tidal power system, integr...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Single Turbine Test Procedure and Data Acquisition Plan, Rev. B
The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80. This document describes the te...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System Mooring Design Overview for Cobscook Bay, Maine
This document summarizes the design of the Single Turbine Subsystem (STS) 2-point mooring system in Cobscook Bay, ME. The TidGen80 (TD80) is a mid-water column tidal energy device being developed by ORPC. Initial testing will utilize a previously installed Bottom Support Frame (BS...
Scott, M. Ocean Renewable Power Company
Oct 19, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Control and SCADA System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
HERO WEC 2024 Electrical Configuration Deployment Data
The following submission includes raw and processed electrical configuration deployment data from the in water deployment of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of parquet files, TDMS files, CSV files, bag files, and MATLAB w...
Jenne, S. et al National Renewable Energy Laboratory
Apr 18, 2024
16 Resources
0 Stars
Curated
16 Resources
0 Stars
Curated
TidGen: Single Turbine Subsystem (STS) Device Installation, Deployment, Retrieval, and Removal Procedures
This document provides the process details for installation of the Single Turbine Subsystem (STS) device from the assembly laydown location to the deployed location in Eastport, ME. These procedures will be conducted not only during initial deployment, but also during maintenance ...
Martin, T. Ocean Renewable Power Company
Feb 20, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Deployment and Mooring System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Final System Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave WEC Holistic PTO Design
This project aims to advance the Technology Readiness Level (TRL) of CalWave’s commercial scale Power Take-Off (PTO) subsystem through further increasing the level of coupling in physical PTO and concurrent controls design. This is achieved by incorporating a systematic holistic...
Boerner, T. et al CalWave Power Technologies Inc.
Sep 02, 2022
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
SeaRAY WEC Preliminary Design and Test Planning
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Hammagren, E. et al Columbia Power Technologies, Inc.
May 18, 2020
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
CalWave Open Water Demo Budget Period 1 Reports
The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstr...
Boerner, T. et al CalWave Power Technologies Inc.
Jun 03, 2019
8 Resources
0 Stars
Awaiting release
8 Resources
0 Stars
Awaiting release
Experimental Testing of a Floating Oscillating Surge Wave Energy Converter at Hinsdale Wave Research Laboratory
In order to generate a public data set that can be used to validate Wave Energy Converter (WEC) numerical codes, such as WEC-Sim, Sandia National Laboratories led an experimental testing campaign of a 1:33 scale Floating Oscillating Surge Wave Energy Converter (FOSWEC) in the Dire...
Ruehl, K. et al Sandia National Laboratories
Jun 15, 2016
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
CalWave Tank Testing Lir Deep Ocean Basin
Experimental tank testing report for CalWave's 1:20 & 1:30 scale prototype testing at the Lir National Ocean Test Facility in Ireland. Testing was completed in January 2018. Test report includes description of the scaled prototype, primary testing objectives, instrumentation and b...
Boerner, T. CalWave Power Technologies Inc.
Jan 15, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors
The lifetime assessment experimental platform described in this report is specifically designed for testing the low-speed main shaft seal for Verdant Power's (Verdant Power Inc., New York, New York) fifth-generation (Gen5) underwater power generation turbine. This project is joint...
Murray, R. et al National Renewable Energy Laboratory
Jul 01, 2024
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
MARMOK-Oscillating Water Column: WEC Tank Testing Campaign Data (November 2022)
The main objective of this project is advancing towards the commercial viability of IDOM's floating Oscillating Water Column (OWC) technology by performing a detailed WEC design to fit PacWave-South site conditions. This includes tank testing campaign data conducted by IDOM at TEX...
De Miguel, B. and Maeso, A. IDOM Incorporated
Nov 17, 2022
3 Resources
0 Stars
Awaiting release
3 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Preliminary IO&M and Testing Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Wave Tank Testing of 1-DoF Heaving Buoy for Controls Validation Purposes
This submission includes the wave tank testing data used to validate the controls optimization efforts of a heaving 1-DoF buoy.
Previsic, M. et al Re Vision Consulting
Jul 13, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Characterization Program
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Composites Structural Testing
Seawater aging response was investigated in marine-grade glass/epoxy, glass/vinyl ester, carbon/epoxy and carbon/vinyl ester composites with respect to water uptake, interlaminar shear strength, flexural strength, tensile strength, and tensile fracture surface observations. The re...
Krumpe, A. ORPC Inc.
Jan 06, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan
Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave Open Water Demonstration PTO Belt Assessment & Test Report Public
PTO (Power Take-Off) belt test and analysis report conducted under CalWave's Open Water Demonstration Award EE0008097 Belt Tradeoffs for Winch PTO. The report tests two types of belts: a high modulus polyethylene (HMPE) woven fiber belt and a steel cable polyurethane belt. The goa...
Kojimoto, N. and Boerner, T. CalWave Power Technologies Inc.
May 28, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Timeseries Data from the Experimental Testing of the OPI's Prototype Hydraulic Drivetrain.
Timeseries data from the experimental testing of the OPI's prototype hydraulic drivetrain. The data is provided in .mat file format. The units for the data can be found in the ReadMe included in the submission resources.
Mundon, T. Oscilla Power, Inc.
Nov 26, 2021
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release