Search MHK Data
Showing results 51 - 75 of 108.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
MBARI-WEC September and October 2022 Field Data
This data is needed to simulate a model of the MBARI-WEC (Monterey Bay Aquarium Research Institute, Wave Energy Converter device) in a simulation environment (e.g. Gazebo) for 56 observation dates in the time between September and October 2022, and to compare the simulation output...
Dizon, C. et al Oregon State University
Sep 07, 2022
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, WaveDyn Models
Archive containing the WaveDyn models used for analysis of the Centipod WEC with and without Advanced Controls, i.e. the WaveDyn files contain a baseline model which can be run alone, and a model predictive control (MPC) model which must be run when connected to the MPC controller...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Triton-C WEC Detailed System Design Package
The Detailed System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
D6 presents an overview of the final detailed design package for the T...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
MBARI WEC 2021 deployment
This dataset includes data from the Monterey Bay Aquarium Research Institute (MBARI) wave energy converter (WEC) and a nearby located Sofar Spotter buoy. The Monterey Bay Aquarium Research Institute has developed and deployed a small two-body point absorber wave energy device suit...
Coe, R. et al Sandia National Laboratories
Oct 12, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Quarterly Technical Report
Quarterly Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeli...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
H3 StingRAY Final Design and Technical Report
The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies' (C-Power) next-generation wave energy converter (WEC), the StingRAY H3. The H3 is a design iteration of C-Power's StingRAY WEC and is intended for electrical pow...
Prudell, J. and Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 15, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
NWEI Azura December 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Dec 29, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
NWEI Azura February 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 11, 2018
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Model
This zip file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the standard toolboxes that are required to run WEC-Sim the user wi...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Triton-C Point Absorber Preliminary System Design Package
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
Mundon, T. Oscilla Power, Inc.
Dec 01, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura November 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 25, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura December 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 27, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura January 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 27, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura February 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 31, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura March 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 31, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura August 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Oct 03, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura September 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Oct 07, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura June 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 18, 2016
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura July 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 23, 2016
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura September 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 24, 2016
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura October 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 24, 2016
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible