Search MHK Data
Showing results 26 - 50 of 229.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. In...
Hayes, N. Ocean Renewable Power Company
Jun 03, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System (STS) Deployment and Mooring Report
This document provides a summary for the performance of the deployment and mooring systems for a single turbine test system (STS) deployed by the Ocean Renewable Power Company (ORPC) in Cobscook Bay, Maine in 2023.
Pillsbury, L. Ocean Renewable Power Company
Jan 05, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System System Fabrication Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
UNH TDP Shark Meter Raw Data and Processing Scripts Fall 2021
This submission contains raw Shark Power Meter data and processing scripts associated with MHKDR submission 394 (UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary, DOI: 10.1...
Bharath, A. et al National Renewable Energy Laboratory
Dec 21, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torqu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TEAMER: Results of Investigating Structural Design Concepts and Alternative Materials for a Wave Power System
Included here are materials from a study on the design of a three-body Wave Energy Converter (WEC) utilizing a heave plate, dual Power Take Offs (PTOs), and single point mooring. A material trade study has been conducted to evaluate the effects of introducing various metallic and ...
Whitney, C. et al Cardinal Engineering
Apr 27, 2024
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated
CalWave Open Water Demonstration PTO Belt Assessment & Test Report Public
PTO (Power Take-Off) belt test and analysis report conducted under CalWave's Open Water Demonstration Award EE0008097 Belt Tradeoffs for Winch PTO. The report tests two types of belts: a high modulus polyethylene (HMPE) woven fiber belt and a steel cable polyurethane belt. The goa...
Kojimoto, N. and Boerner, T. CalWave Power Technologies Inc.
May 28, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TidGen: Turbine Production Report
The report below provides a comprehensive overview of the production process for the first TidGen turbine. The turbine is composed of several key components, including carbon fiber foils, e-glass struts, and a steel shaft. The report covers the production of each of these elements...
Barrington, M. Ocean Renewable Power Company
Jan 30, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Control and SCADA System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
2023 Risk Management Plan and Register for Low-Power WEC for Non-Grid Applications
This is an updated risk management plan and risk register for the design, build and test of a novel, remote, low-power wave energy converter (WEC) for non-grid applications. This Columbia Power Technologies project seeks to develop a prototype low-power WEC that lowers the total c...
Hammagren, E. et al Columbia Power Technologies, Inc.
Jun 14, 2023
17 Resources
0 Stars
Awaiting release
17 Resources
0 Stars
Awaiting release
NWEI Azura December 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Dec 29, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave Design For PacWave Preliminary Design Phase Project Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. For the Preliminary Design Phase, the Project Management Plan outlines the project objectives, broader impacts, project tasks and timeline, c...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Amon, E. Columbia Power Technologies, Inc.
Jul 19, 2019
17 Resources
0 Stars
Awaiting release
17 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Preliminary Turbine Hydrodynamic Design
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave WEC Holistic PTO Design
This project aims to advance the Technology Readiness Level (TRL) of CalWave’s commercial scale Power Take-Off (PTO) subsystem through further increasing the level of coupling in physical PTO and concurrent controls design. This is achieved by incorporating a systematic holistic...
Boerner, T. et al CalWave Power Technologies Inc.
Sep 02, 2022
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
TidGen: Single Turbine Subsystem (STS) Device Installation, Deployment, Retrieval, and Removal Procedures
This document provides the process details for installation of the Single Turbine Subsystem (STS) device from the assembly laydown location to the deployed location in Eastport, ME. These procedures will be conducted not only during initial deployment, but also during maintenance ...
Martin, T. Ocean Renewable Power Company
Feb 20, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Holistic PTO Design Product Requirement Document
CalWave Power Technologies is currently in the process of developing the conceptual architecture for a fully upscaled Wave Energy Converter. Current and past efforts have been for smaller scaled systems, with commensurately lower forces and length scales. This document contains a ...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
ORPC TidGen Turbine Foil Production Process Technical Report
This report aims to provide a comprehensive overview of the production process for the first TidGen turbine. The turbine is composed of several key components, including carbon fiber foils, e-glass struts, and a steel shaft. The report covers the production of each of these elemen...
Barrington, M. Ocean Renewable Power Company
Jan 30, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen MHK Generator Composite Fatigue Analysis Procedure
A procedure was described for performing a fatigue analysis of composite foils for an MHK generator. The steps included generating load data, S-N (Stress versus Number of cycles to failure) diagrams through fatigue testing, cycle counts, damage versus load, and cumulative damage. ...
Krumpe, A. ORPC Inc.
Apr 14, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Crossflow Turbine Fairing Geometry Optimization Report and CFD Modeling Files
The dataset includes computational fluid dynamics (CFD) models and simulation files for crossflow turbines as well as a detailed project report. The report documents the project undertaken by the Ocean Renewable Power Company (ORPC) to design and optimize a modular fairing for the...
McEntee, J. Ocean Renewable Power Company
Aug 08, 2024
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
Advanced TidGen Power System Composites Structural Testing
Seawater aging response was investigated in marine-grade glass/epoxy, glass/vinyl ester, carbon/epoxy and carbon/vinyl ester composites with respect to water uptake, interlaminar shear strength, flexural strength, tensile strength, and tensile fracture surface observations. The re...
Krumpe, A. ORPC Inc.
Jan 06, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Tidal Currents in San Juan Archipelago, Washington
Re-analyzed acoustic Doppler current profiler (ADCP) data originally collected by NOAA CO-OPS (Center for Operational Oceanographic Products and Services) and equivalent point data from Pacific Northwest National Laboratory's FVCOM (Finite Volume Community Ocean Model) model of th...
Polagye, B. et al University of Washington
Dec 15, 2022
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Curated
2 Resources
1 Stars
Curated
TidGen: Permits for Installation of Single Turbine Test System, Cobscook Bay, Maine
This is a summary of permits required and obtained for installation, operation, removal of the TidGen Single Turbine Test system in Cobscook Bay, May in 2023. The Ocean Renewable Power Company (ORPC) worked with federal and state entities to gain required permits and approvals tha...
Sellers-Reynolds, K. Ocean Renewable Power Company
Feb 27, 2024
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible