Search MHK Data
Showing results 1 - 25 of 110.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
StingRAY Updated WEC Risk Registers
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. and Ondusko, M. Columbia Power Technologies, Inc.
Jun 27, 2018
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
Wave Tank Testing of 1-DoF Heaving Buoy for Controls Validation Purposes
This submission includes the wave tank testing data used to validate the controls optimization efforts of a heaving 1-DoF buoy.
Previsic, M. et al Re Vision Consulting
Jul 13, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
StingRAY WEC Risk Register
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. Columbia Power Technologies, Inc.
Feb 24, 2017
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
MOIS Installation on NWEI Azura Half Scale WEC WETS Testing Documentation
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentatio...
Nelson, E. National Renewable Energy Laboratory
May 30, 2015
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficient...
Rhinefrank, K. Columbia Power Technologies, Inc.
Jul 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Detailed Simulation Runs and Summary Data
Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges:
Significant Wave Height: 0.25 4.0m in 0.25m incre...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Triton-C WEC Numerical and LCOE Content Models (DDP)
These are the Content Models for the Triton-C multi-mode point absorber WEC based on the Detailed System Design Package (DDP), including WEC Numerical and LCOE Content Models.
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Dec 21, 2020
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
National Marine Renewable Energy Center Upgrades LUPA
The data provided is part of a power take off damping optimization study. The power take off damping coefficient was swept from 0 to approximately 7000 N/m/s during a single regular wave test with a real time control of the motor/generator. The generated power from the LUPA (Lab U...
Robertson, B. et al Oregon State University
Oct 12, 2022
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
SeaRAY WEC Preliminary Design and Test Planning
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Hammagren, E. et al Columbia Power Technologies, Inc.
May 18, 2020
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
Oscilla Power Triton 1310 System Overview and Baseline LCOE Calculations
This project aims to enhance survivability of a multi-mode point absorber. Included in this submission are content models providing a system definition and baseline LCOE calculations.
Mundon, T. Oscilla Power, Inc.
Jan 03, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Triton-C WEC Detailed System Design Package
The Detailed System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
D6 presents an overview of the final detailed design package for the T...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
StingRAY H1 Humboldt Cost Breakdown Structure
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
PacWave South SeaRAY k2 Risk Registers
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 29, 2023
12 Resources
0 Stars
Awaiting release
12 Resources
0 Stars
Awaiting release
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
NWEI Azura December 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Dec 29, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
NWEI Azura February 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 11, 2018
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Triton-C Point Absorber Preliminary System Design Package
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
Mundon, T. Oscilla Power, Inc.
Dec 01, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
NWEI Azura July 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura Aug 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura Sept 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura Oct 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura December 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Feb 21, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible