Search MHK Data
Showing results 1 - 25 of 414.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
ORPC TidGen Turbine Foil Production Process Technical Report
This report aims to provide a comprehensive overview of the production process for the first TidGen turbine. The turbine is composed of several key components, including carbon fiber foils, e-glass struts, and a steel shaft. The report covers the production of each of these elemen...
Barrington, M. Ocean Renewable Power Company
Jan 30, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Turbine Production Report
The report below provides a comprehensive overview of the production process for the first TidGen turbine. The turbine is composed of several key components, including carbon fiber foils, e-glass struts, and a steel shaft. The report covers the production of each of these elements...
Barrington, M. Ocean Renewable Power Company
Jan 30, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen LCOE Workbooks
Workbooks showing Annualized Energy Production, Cost Breakdown Structure, Levelized Cost of Electricity for DOE Reference Tidal Project
1) Baseline TidGen Power System
2) TidGen Power System with the application of Advanced Controls
3) Advanced TidGen Power System with several enh...
McEntee, J. Ocean Renewable Power Company
Mar 21, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Characterization Program
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Modular RivGen LCOE Content Model
The Modular RivGen LCOE Content Model contains estimates of levelized cost of energy (LCOE) for three array configurations operating in a theoretical river environment. The LCOE is distinguished by the CapEx, OpEx, and annual energy production and capture for each river environment.
Tyler, R. and Obomsawin, T. Ocean Renewable Power Company
Dec 15, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Specified System Requirements for the HydroAir Power Take Off System
Includes Annual Energy Production of the system, Target Availability of the system, the system's PWR (power to weight ratio), Critical Dimensions and Weights (e.g. center of gravity and center of buoyancy, capture length) of the system, the system's Noise Levels, and All Grid Requ...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
LCOE Baseline for RME Surge WEC Device
This submission includes all the data to support an LCOE baseline assessment for the Resolute Marine Energy (RME) Surge WEC device.
Previsic, M. et al Re Vision Consulting
Jul 19, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Detailed Simulation Runs and Summary Data
Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges:
Significant Wave Height: 0.25 4.0m in 0.25m incre...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
MBARI WEC 2021 deployment
This dataset includes data from the Monterey Bay Aquarium Research Institute (MBARI) wave energy converter (WEC) and a nearby located Sofar Spotter buoy. The Monterey Bay Aquarium Research Institute has developed and deployed a small two-body point absorber wave energy device suit...
Coe, R. et al Sandia National Laboratories
Oct 12, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX Model Baseline LCOE
This is the raw LCOE model used to establish baseline performance for the M3 Wave DMP/APEX submerged mid-column pressure differential WEC. The model includes initial capital cost, levelized replacement cost, levelized operations and maintenance cost, and net annual energy producti...
Morrow, M. M3 Wave
Feb 28, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. In...
Hayes, N. Ocean Renewable Power Company
Jun 03, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torqu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC Projected LCOE
Projected LCOE model for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," based on information gained during project performance.
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 01, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Triton-C WEC Numerical and LCOE Content Models (DDP)
These are the Content Models for the Triton-C multi-mode point absorber WEC based on the Detailed System Design Package (DDP), including WEC Numerical and LCOE Content Models.
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Dec 21, 2020
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Single Turbine Test Procedure and Data Acquisition Plan, Rev. B
The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80. This document describes the te...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Triton-C Point Absorber Preliminary System Design Package
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
Mundon, T. Oscilla Power, Inc.
Dec 01, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine System Mooring Design Overview for Cobscook Bay, Maine
This document summarizes the design of the Single Turbine Subsystem (STS) 2-point mooring system in Cobscook Bay, ME. The TidGen80 (TD80) is a mid-water column tidal energy device being developed by ORPC. Initial testing will utilize a previously installed Bottom Support Frame (BS...
Scott, M. Ocean Renewable Power Company
Oct 19, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TEAMER: Tidal Currents in San Juan Archipelago, Washington
Re-analyzed acoustic Doppler current profiler (ADCP) data originally collected by NOAA CO-OPS (Center for Operational Oceanographic Products and Services) and equivalent point data from Pacific Northwest National Laboratory's FVCOM (Finite Volume Community Ocean Model) model of th...
Polagye, B. et al University of Washington
Dec 15, 2022
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
Triton-C WEC Detailed System Design Package
The Detailed System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
D6 presents an overview of the final detailed design package for the T...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
StingRAY Structural Optimization Final Technical Report Appendices
The protected data appendices to the public Final Technical Report.
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing stru...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
16 Resources
0 Stars
Awaiting release
16 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Deployment and Mooring System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
MASK4 Test Campaign for Sandia WaveBot Device Dataset
This data and report details the findings from a wave tank test focused on production of useful work of a wave energy converter (WEC) device. The experimental system and test were specifically designed to validate models for power transmission throughout the WEC system. Additional...
Forbush, D. et al Sandia National Laboratories
Dec 25, 2023
5 Resources
0 Stars
Curated
5 Resources
0 Stars
Curated