Sub-Scale Stage 1 Magnetic Gear for a Marine Hydrokinetic Generator
The goal of this project is to design, fabricate, and test a hermetically sealed 50 kilowatt (kW) multistage magnetically geared generator (MGG). In
order to reduce risk, a sub-scale 5kW multistage MGG was first built. This project will benefit MHK device developers by providing a...
Bird, J. Portland State University
May 12, 2022
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
Centipod WEC, Advanced Controls, WaveDyn Models
Archive containing the WaveDyn models used for analysis of the Centipod WEC with and without Advanced Controls, i.e. the WaveDyn files contain a baseline model which can be run alone, and a model predictive control (MPC) model which must be run when connected to the MPC controller...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Northwest National Marine Renewable Energy Center, OR Project Plans
Plans for Northwest National Marine Renewable Energy Center (NNMREC) Project.
Mobile Ocean Test Berth (MOTB) plans
PMEC-SETS Plans
Hellin, D. Northwest National Marine Renewable Energy Center
Jun 29, 2016
20 Resources
0 Stars
Publicly accessible
20 Resources
0 Stars
Publicly accessible
MASK3 for Advanced WEC Dynamics and Controls
This report outlines the "MASK3" wave tank test within the Advanced WEC Dynamics and Controls (AWDC) project. This test represents the final test in the AWDC project. The focus of the MASK3 test was to consider coordinated 3-degree-of-freedom (3DOF) control of a WEC in a realistic...
Coe, R. et al Sandia National Laboratories
May 01, 2019
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
WEC Controls Optimization Final Report
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be cons...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TEAMER: Numerical Model of IProTech PIP WEC Device
iProTech PIP wave energy converter (WEC) is a slack moored, single hull device with no moving parts in the water, joints or bearings. This submission includes data of the simulation, reports, and code for the iProTech PIP (WEC) project. The organization of the data included in the...
Ogden, D. et al IProTech
Nov 02, 2021
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Numerical Modeling and Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC)
This project focused on developing an automated workflow to evaluate and optimize the iProTech Pitching Inertial Pump (PIP) wave energy converter (WEC) using open-source Python packages and the MATLAB/Simulink tool, WEC-Sim. The process involved parameterizing key design variables...
Wynn, N. et al National Renewable Energy Laboratory
Apr 11, 2024
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
Tidal Energy Site Characterization East Forelands Alaska
During the summer field season in 2012, Benthic GeoScience Inc. (Benthic) mobilized under contract with Ocean Renewable Power Company (ORPC) in order to conduct precise geospatial measurements of the seafloor accomplishing a preliminary Site Characterization Study for the ORPC Eas...
Worthington, M. National Renewable Energy Laboratory
Apr 01, 2013
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
Oscilla Power Triton 1310 System Overview and Baseline LCOE Calculations
This project aims to enhance survivability of a multi-mode point absorber. Included in this submission are content models providing a system definition and baseline LCOE calculations.
Mundon, T. Oscilla Power, Inc.
Jan 03, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Next Generation RivGen Power System: Kvichak River, AK Overwinter Ice Study
The University of Alaska Fairbanks (UAF) Alaska Hydrokinetic Energy Research Center was tasked with developing a real-time data telemetry / remote power generation system to monitor frazil ice conditions in the Kvichak River in support of the U.S. Department of Energy funded "Next...
Kasper, J. et al Igiugig Village Council
Oct 04, 2017
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
CalWave Open Water Demo Budget Period 1 Reports
The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstr...
Boerner, T. et al CalWave Power Technologies Inc.
Jun 03, 2019
8 Resources
0 Stars
Awaiting release
8 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC Device Configuration Drawings
Configurations as tested and modeled in final phase of project for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 08, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TEAMER: Maximal Asymmetric Drag Wave Energy Converter
Boundary element method (BEM) and WEC-Sim analysis of UMass Dartmouth's maximal asymmetric drag wave energy converter (MADWEC), including its tethered ballast system and PTO (power take-off).
This project is part of the TEAMER RFTS 6 (request for technical support) program.
MacDonald, D. et al University of Massachusetts Dartmouth
Aug 18, 2023
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Co-Design of Marine Energy Converters for Autonomous Underwater Vehicle Docking and Recharging Software and Data
Software and testing data from the OH Hinsdale Wave lab for DOE-funded project on Co-Design of Marine Energy Converters for Autonomous Underwater Vehicle Docking and Recharging. This project will perform foundational research and testing to accelerate the sector-wide development a...
Hollinger, G. et al Oregon State University
Oct 26, 2022
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Northwest National Marine Renewable Energy Center, OR Site Selection Evaluation
Northwest National Marine Renewable Energy Center Project fishing vessel charter survey and South Energy Test Site (SETS) selection evaluation report.
Hellin, D. Northwest National Marine Renewable Energy Center
Jun 29, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
RITE Gen5 KHPS Performance Period B
Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and char...
Corren, D. et al Verdant Power Inc.
Dec 23, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
HERO WEC V1.0 SolidWorks Model
The attached zip file includes a SolidWorks pack-and-go assembly of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter) V1.0. This model does not include all aspects of the design (i.e. RO (reverse osmosis) system, electrical enclosure, hose, cable) it o...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
ALFA Non-linear Ocean Waves and PTO Control Strategy
Data from Advanced Laboratory and Field Arrays (ALFA) Non-linear Ocean Waves and Power Take-Off (PTO). Control Strategy project conducted at the O.H. Hinsdale Wave Research Laboratory (HWRL) at Oregon State University in 2019/2020. Contains two zip files (ALFANL.zip, ALFANL2.zip)...
Bosma, B. et al Pacific Marine Energy Center (PMEC)
Oct 28, 2019
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System ORPC Public Technical Report, Device Design
Technical report for public dissemination on the design progress for the Advanced TidGen(R) Power System.
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 27, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Specified System Requirements for the HydroAir Power Take Off System
Includes Annual Energy Production of the system, Target Availability of the system, the system's PWR (power to weight ratio), Critical Dimensions and Weights (e.g. center of gravity and center of buoyancy, capture length) of the system, the system's Noise Levels, and All Grid Requ...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TEAMER: ORPC Pitching Foil Crossflow Turbine Efficiency Testing Report
Turbine performance data, collected and processed by the University of New Hampshire (UNH). This presentation includes turbine performance vs tow speed and Reynolds #, turbine performance vs tip-speed ratio, as well as the TARE values used for processing the data.
Project was fun...
Pillsbury, L. Ocean Renewable Power Company
Sep 01, 2022
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
RITE Gen5 KHPS Performance Period A
Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over Period A which was a 39 day span ending on 11/12/2021. This data was collected under the European Marine Energy Centre (EMEC) power ...
Colby, J. et al Verdant Power Inc.
Nov 12, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release