Search MHK Data
Showing results 101 - 125 of 226.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Advanced TidGen Power System Composites Structural Testing
Seawater aging response was investigated in marine-grade glass/epoxy, glass/vinyl ester, carbon/epoxy and carbon/vinyl ester composites with respect to water uptake, interlaminar shear strength, flexural strength, tensile strength, and tensile fracture surface observations. The re...
Krumpe, A. ORPC Inc.
Jan 06, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TidGen: Permits for Installation of Single Turbine Test System, Cobscook Bay, Maine
This is a summary of permits required and obtained for installation, operation, removal of the TidGen Single Turbine Test system in Cobscook Bay, May in 2023. The Ocean Renewable Power Company (ORPC) worked with federal and state entities to gain required permits and approvals tha...
Sellers-Reynolds, K. Ocean Renewable Power Company
Feb 27, 2024
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave Open Water Demo Budget Period 1 Reports
The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstr...
Boerner, T. et al CalWave Power Technologies Inc.
Jun 03, 2019
8 Resources
0 Stars
Awaiting release
8 Resources
0 Stars
Awaiting release
MHK Levelized Cost of Energy (LCOE) Guidance and Techo Economic Analysis Materials
Useful information and tools for calculating the Levelized Cost of Energy (LCOE) and MHK Cost Breakdown Structure. Includes a structure for calculating the capital expenditures and operating costs of a marine energy technology or device, reference resource data for both wave and ...
Jenne, S. and Baca, E. National Renewable Energy Laboratory
Nov 08, 2019
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Specified System Requirements for the HydroAir Power Take Off System
Includes Annual Energy Production of the system, Target Availability of the system, the system's PWR (power to weight ratio), Critical Dimensions and Weights (e.g. center of gravity and center of buoyancy, capture length) of the system, the system's Noise Levels, and All Grid Requ...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
H3 StingRAY Final Design and Technical Report Section 13 Appendices
These documents are referenced in the public version of the H3 StingRAY Final Design and Technical Report (Linked Dataset can be found in Resources section, below), and are submitted separately to allow for public release of head document. The display names have the corresponding ...
Lenee-Bluhm, P. and Prudell, J. Columbia Power Technologies, Inc.
Sep 15, 2023
53 Resources
0 Stars
Awaiting release
53 Resources
0 Stars
Awaiting release
StingRAY Structural Optimization Final Technical Report Appendices
The protected data appendices to the public Final Technical Report.
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing stru...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
16 Resources
0 Stars
Awaiting release
16 Resources
0 Stars
Awaiting release
TEAMER: Tidal Currents Turbine Parametric Study Flow, Power, Torque, and Energy Optimization
This is an exercise in optimizing the flow through a shrouded axial turbine to have the least resistance and to have optimal output and torque and energy. In this study, different variations of the original geometry of the current turbine designed by Hydrokinetic Energy Corp. (HEC...
Schurtenberger, W. and Ge, Z. Hydrokinetic Energy Corp.
Jul 30, 2021
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
TEAMER: CalWave xWave New Technology Qualification and Path to Certification Final Report
CalWave is developing a wave energy converter (WEC) called xWave, which operates fully submerged and is classified as a submerged pressure differential type. As ocean waves pass over the submerged wave buoy, a pressure differential is created, exciting the absorber in multiple deg...
Petcovic, D. and Zhang, S. CalWave Power Technologies Inc.
Oct 31, 2022
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
HERO WEC 2024 Hydraulic Configuration Deployment Data
The following submission includes raw and processed data from the in water deployment of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of parquet files, TDMS files, CSV files, bag files and MATLAB workspaces. This dataset was collected...
Jenne, S. et al National Renewable Energy Laboratory
Mar 14, 2024
9 Resources
0 Stars
Curated
9 Resources
0 Stars
Curated
Wave and Offshore Wind Resource in the U.S. Pacific Ocean Minor Outlying Islands
Coastal environments such as islands have unique opportunities for renewable energy resources. This work explores the wave and offshore wind energy potential for the U.S. Pacific Ocean Minor Outlying Islands, including Baker Island, Howland Island, Jarvis Island, Johnston Atoll, K...
Yang, Z. et al Pacific Northwest National Laboratory
Dec 31, 2020
30 Resources
0 Stars
Curated
30 Resources
0 Stars
Curated
StingRAY Structural Optimization Final Technical Report
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing structural material and manufacturing costs and increasing energy output. ...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Design Details
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simula...
Banko, R. et al Dehlsen Associates, LLC
Jun 03, 2015
22 Resources
0 Stars
Publicly accessible
22 Resources
0 Stars
Publicly accessible
CalWave Device Behavior in Different Sea States from Scaled Tank Testing
This submission contains a summary of tank test derived WEC device behavior in different irregular sea states.
CalWave sought to conduct experimental tank testing of scaled prototype units early on in the design process to obtain a first estimation of device performance for sea ...
Boerner, T. and Murray, B. CalWave Power Technologies Inc.
Mar 30, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Triton-C WEC Detailed System Design Package
The Detailed System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
D6 presents an overview of the final detailed design package for the T...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors
The lifetime assessment experimental platform described in this report is specifically designed for testing the low-speed main shaft seal for Verdant Power's (Verdant Power Inc., New York, New York) fifth-generation (Gen5) underwater power generation turbine. This project is joint...
Murray, R. et al National Renewable Energy Laboratory
Jul 01, 2024
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
MASK2B Initial Results from Wave Tank Test of Closed-Loop WEC Control
This dataset covers the MASK2B wave tank experiment focused on a more complete study of one degree of freedom (1DOF) control of the WEC was considered, including maximization of electrical power, multi-objective performance mapping, and implementation of a novel predictionless con...
Coe, R. et al Sandia National Laboratories
May 25, 2018
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Hydrokinetic Canal Measurements: Inflow Velocity, Wake Flow Velocity, and Turbulence
The dataset consist of acoustic Doppler current profiler (ADCP) velocity measurements in the wake of a 3-meter diameter vertical-axis hydrokinetic turbine deployed in Roza Canal, Yakima, WA, USA. A normalized hub-centerline wake velocity profile and two cross-section velocity con...
Gunawan, B. Sandia National Laboratories
Jun 11, 2014
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
MARMOK-Oscillating Water Column: WEC Tank Testing Campaign Data (November 2022)
The main objective of this project is advancing towards the commercial viability of IDOM's floating Oscillating Water Column (OWC) technology by performing a detailed WEC design to fit PacWave-South site conditions. This includes tank testing campaign data conducted by IDOM at TEX...
De Miguel, B. and Maeso, A. IDOM Incorporated
Nov 17, 2022
3 Resources
0 Stars
Awaiting release
3 Resources
0 Stars
Awaiting release
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
TidGen: Turbine Production Report
The report below provides a comprehensive overview of the production process for the first TidGen turbine. The turbine is composed of several key components, including carbon fiber foils, e-glass struts, and a steel shaft. The report covers the production of each of these elements...
Barrington, M. Ocean Renewable Power Company
Jan 30, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Triton Point Absorber 1:30 Scale Tank Test Data for Extreme Wave Environments
This content model summarizes laboratory testing data for the Oscilla Power Triton WEC conducted at 1:30 scale. The WEC was tested in large operational waves and in extreme wave conditions along the 1 in 50 year wave contour at the DoE reference location in Humbolt Bay, CA. The WE...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Mar 13, 2018
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
2023 Risk Management Plan and Register for Low-Power WEC for Non-Grid Applications
This is an updated risk management plan and risk register for the design, build and test of a novel, remote, low-power wave energy converter (WEC) for non-grid applications. This Columbia Power Technologies project seeks to develop a prototype low-power WEC that lowers the total c...
Hammagren, E. et al Columbia Power Technologies, Inc.
Jun 14, 2023
17 Resources
0 Stars
Awaiting release
17 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Material Characterization Program
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible